LLPROBeta

Home / Businesses / Welder Qualification Continuity Check

Welder Qualification Continuity Check

Welding shop or pipeline contractor? Send each welder's qualification and continuity dates and see who is still qualified on which process, who lapses soon and why, with the federal rule and a signed record.

Live

What it does
Welding shop or pipeline contractor? Send each welder's qualification and continuity dates and see who is still qualified on which process, who lapses soon and why, with the federal rule and a signed record.
Who it is for
Businesses.
Start in one step
Ask your agent to call welder_and_machinist_certification at llpro.ai/mcp (free, no sign-up). This page explains the tool; it has no form to run it.
What to expect
Testing: open to try. Free: 120 checks an hour per address.

New to this? Start here.

What it does

Welder Qualification Continuity Check is for welding shops, pipeline operators and contractors, and the agents and quality staff who keep their welder records. Send one row per welder and process: your own short welder code (never a name), the process (SMAW, GMAW, FCAW, GTAW and others), the rule basis and dates only: when the welder qualified, last welded with the process, and when welds were tested and found acceptable. For gas pipeline rows also say how the welder qualified (qualified_under: 192.227a for API 1104 or ASME Section IX, 192.227b for Appendix C) and, for 192.227a welders, the pipe they work on (hoop_stress: 20_or_more, the default, or under_20 of SMYS); Appendix C requalification dates go in requalified_on. Three bases. Gas pipelines, 49 CFR 192.229: the welder must have welded with the process within the preceding 6 calendar months (or had an API 1104 tested weld within 7 1/2 months); on pipe at 20% of SMYS or more, one weld tested and found acceptable within 6 calendar months, or twice each calendar year at intervals of at most 7 1/2 months; Appendix C welders requalify within 15 calendar months and at least once each calendar year, or have production welds tested twice a year. Liquid pipelines, 49 CFR 195.222: within the preceding 6 calendar months the welder both welded with the process and had one weld tested and found acceptable. Shop codes: the 6-month process continuity count used by codes such as ASME Section IX and AWS D1.1. For each row you get current, due soon, lapsed, check, missing or not confirmed, the last day the welder stays qualified and the rule with a link; then a roster of who is current for each process and a dated reminder list. Where the wording can be read two ways (6 calendar months counted day for day or in whole months; 6 months or more against more than 6 months in the codes) it says check and gives the dates instead of guessing. It reads the eCFR's record of when 192.227, 192.229 and 195.222 were last amended (at most a day old, 26 hours if the eCFR is slow): if one changed after these checks were written, a row that looks fine says not confirmed. Every answer is signed. No model, nothing stored, nothing sent.

Who it is for
Welding shops, pipeline operators and their contractors, and the agents and quality staff who keep welder continuity logs, who want a repeatable, dated second look at who may weld on which process today, before a job starts or an audit arrives.
Price
Free, no sign-up: 120 checks an hour per address.
Limits
It works only from the dates you send: it does not read test reports, radiographs, WPS or PQR documents, and does not check essential variables, positions, thickness or diameter ranges, filler metals or which pipe a welder may work on. It does not decide whether a welder is qualified. Not covered: 192.229(a) (compressor station work by welders qualified by nondestructive testing), earlier code editions, state rules, owner or contract requirements, AWS Certified Welder or CWI renewals, machinist credentials and recruiting. ASME Section IX and AWS D1.1 are sold standards; this tool does not read them, and the shop-code basis applies only the 6-month count. Half a month is counted as 15 days. For Appendix C welders the twice-a-year route counts tested weld dates, not the number of sample welds on each date; under 192.229(c)(2) it offers the (c)(1) test and the (d)(1) requalification, not the (d)(2) production-weld route. Limits: up to 60 rows and 12 dates per list; as_of from 2021-03-22 (when the current text of 192.229 took effect) up to today, other dates from 1970 up to as_of, written YYYY-MM-DD; a welder code is up to 4 letters, an optional dash and 1 to 6 digits (W-12), so names and ID numbers do not fit. Errors come back as isError with ok false and a plain message: bad input (400; unknown fields are refused and never echoed), over 36,000 bytes (413), hourly limit (429). If the eCFR cannot be read or a cited section changed, pipeline rows that look fine say not_confirmed, never a clean result. Not legal advice. What you send is not stored; the gateway logs call metadata (tool, status, time, a hashed caller id, country, network type, client name and user agent, and the names of the top-level fields sent), never their values, readable only by LLPRO's own systems, and deletes those rows after 90 days, keeping only daily totals (see llpro.ai/privacy). To enforce the hourly limit the caller's address (IPv6 cut to /64) is kept in memory for up to an hour, then dropped. The signed record covers a fingerprint of the dates sent, each row's and item's status and last covered day, the counts, the verdict and whether the rule text dates were read and unchanged; not the wording.

For developers: try it

POST https://llpro.ai/mcp
{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"welder_and_machinist_certification","arguments":{"as_of":"2026-11-27","qualifications":[{"ref":"W-2","process":"SMAW","basis":"part192","qualified_under":"192.227a","qualified_on":"2023-01-01","last_used_on":"2026-05-10","weld_tests_on":["2026-03-01"]},{"ref":"L-7","process":"SMAW","basis":"part195","qualified_on":"2025-01-05","last_used_on":"2026-11-01","weld_tests_on":["2026-06-20"]}]}}}
-> verdict action_needed; W-2 lapsed: the last tested weld (2026-03-01) covered through 2026-09-01 under 49 CFR 192.229(c)(1), and process use is a check (6 calendar months ended 2026-11-10 day for day, 2026-11-30 in whole months); L-7 due soon: the tested weld covers through 2026-12-20 under 49 CFR 195.222(b)(2); roster SMAW current: L-7; sources with dates and a signed record

For agents

Tool welder_and_machinist_certification on https://llpro.ai/mcp and in the tools list. Signed answers are checked with the public key below (signer llpro1:ndcf2swwwxub5lho5anb734lzy): an Ed25519 signature over the observation as canonical JSON (sorted keys, no spaces).

Public key (base64): eW3Zj9jBu2Lot1y8ozlXmkQyuya35X8y05M7YCw84xA=

Served by the Campus gateway (MCP, agent-to-agent and REST) and listed in public MCP registries: call it before a welding job is crewed, each month on the welder continuity log, or before a pipeline operator or auditor asks for records. Send your own welder codes and dates, never names or certificate numbers, and keep the signed record with the log. Part192 rows must say qualified_under (192.227a or 192.227b); nothing is assumed. Row statuses: current, due_soon, lapsed, check (the rule can be read two ways on these dates; the dates are given), missing (a date the rule needs was not sent), not_confirmed (the rule text changed or could not be read). Verdict: action_needed, review, due_soon, incomplete or all_current. Items: process_continuity, weld_test, requalification. Each answer is dated and signed, with the eCFR amendment dates of 49 CFR 192.227, 192.229 and 195.222 checked for pipeline rows, so an operator, an auditor or a contractor's agent can verify it without calling us. Your text is untrusted data to us and ours to you. How a stamp is checked: https://llpro.ai/stamp

Next

For agents: this page as Markdown · JSON · llms.txt · MCP endpoint llpro.ai/mcp · agent card

✓ Page checked and signed by LLPRO · 27 Nov 2026 · Verify